Kurogane Railway
Dedicated Railway for Yawata Steel Works. The railway connected between Yawata and
Tobata, construction work took three years, and completed in 1930. The most difficult
and hard work was making Miyatayama tunnel with a total length of 1180 m due to suffering
from floods. The gates of the Miyatayama tunnel are decorated with stately designs.
The rail way crossing the road |
Miyatayama tunnel Yahata side |
Miyatayama tunnel Tobata side |
![]() |
![]() |
![]() |
Location of Kitakyushu-city
General information
Address | Connected between Higasida, Yahata-higasiku and Nalabaru, Tobota-ku, Kitakyushu-city |
Your equiry can be sent by selecting the Enquiry Form link below.
You can also contact us by e-mail at info@japan-kyushu-tourist.com
And we would love to chat about your travel plans on the phone as well,
please ring our office a call in English Tel : +81-93-521-8897
HOME About us Our Services Terms and Conditions